Conservatory Roof ReplacementCardiff

Conservatory Roof Rules in Wales, for Cardiff Homes

Planning and Building Regulations are separate tests. The first cares about appearance, the second about construction. A guide, not legal advice.

Rooftops of brick and painted houses behind a hedge, lit by low evening sun

The short version

Planning permission is not usually needed to replace a conservatory roof.

A solid, insulated roof usually does need Building Regulations approval from Cardiff Council, because the conservatory stops being exempt.

Conservation areas and listed homes are different: speak to the council before you settle on materials.

Building Regulations: why a solid roof changes things

You may have heard that conservatories do not need Building Regulations. That is true for a lot of them, but only while they stay conservatories in the sense the rules mean.

The Welsh Government's guidance says a conservatory is normally exempt when all of the following hold:

  • Ground floor and modest in size, with less than 30 square metres of floor inside.
  • Shut off from the house, with an external-grade door, window or wall between, so the house is not leaking warmth into it.
  • Unheated by the house, meaning no radiators or pipes from the main heating system.
  • Glazing and wiring done to standard, as the relevant parts of the regulations require.

The reason for the exemption is that a lightweight glazed room bolted onto the house is treated as a different kind of building from an extension. Change the roof to solid tiles with insulation and a plastered ceiling, and the room starts to behave like an extension, so it gets treated like one.

Torfaen council publishes an LABC guide for homeowners that gives a number: for the exemption to hold, three quarters or more of the roof has to let light through. Tiles across the whole roof leave nothing like that, so a formal application to Cardiff Council is the normal route.

What building control will look at

Approval is not just a form. Building control wants to know the new roof is properly insulated and ventilated, and that the structure underneath can carry it.

That last point is the one that catches people out. Tiles and insulation put a much bigger load on the conservatory than panes ever did, which means the frame, the posts beside the doors and whatever it all stands on may need checking or strengthening first. A good firm raises this at the survey, not halfway through.

Glass or polycarbonate replacements

If you are swapping like for like and the room stays a glazed conservatory, an application is not usually needed. The glass still has to meet safety glazing rules, which any reputable fitter will know.

Full plans or building notice

There are two ways to apply. Neither is right for everyone, and the difference is mostly about when the checking happens.

Full plans

You send drawings, and the council approves them before anyone lifts a tool. According to the Planning Portal, the council should decide in five weeks, though you can agree to give it as long as two months. Site inspections follow, then a completion certificate.

Lower risk, which suits a heavier roof where the structure matters.

Building notice

No plans are checked in advance. Once the notice has been in for 48 hours the builders can begin, and an inspector checks the work at stages.

Quicker to begin, but if an inspector finds a problem, it is the homeowner who carries the risk of putting it right.

What Cardiff Council charges

Cardiff's published schedule has no line just for conservatory roofs. The two lines most likely to apply are shown here; the council can tell you which it would use for your job, and it sets bespoke charges for work that is not listed.

The council says all its charges except regularisation include VAT.

How do these figures look next to neighbouring councils? Our study of Cardiff's building control fees lays them side by side.

Cardiff Council lineFull plansBuilding noticeRegularisation
Single-storey extension, up to 25m² closest match for a solid roof£571.73 made up of a £155.93 plan charge and £415.80 for inspections£571.73£762.30
Material alteration, single dwelling£311.85£311.85£415.80

Planning permission and Cardiff's conservation areas

According to the Planning Portal, most roof alterations count as permitted development, which means no planning application, provided they keep within the legal limits. Where a new roof changes how the structure looks or is built in a big way, permission can be needed.

For an ordinary house outside a conservation area, replacing a conservatory roof usually needs nothing from the planning department. It is worth a check with the council in these cases:

  • Conservation areas. Cardiff has 27, and the council says many have Article 4 Directions that bring minor alterations under control, Roath Park, Cathedral Road in Pontcanna and Llandaff among them.
  • Listed buildings, where almost any change to the fabric needs consent.
  • Flats and maisonettes, which do not have the householder permitted development rights a house has.
  • Where the original permission came with strings attached, such as conditions on the conservatory or permitted development rights taken away.

If you are not sure which applies, the council's conservation pages are a sensible first stop.

Rules questions we see a lot

My old conservatory never had approval. Does that matter now?

Probably not, if it qualified as an exempt conservatory when it went up: a ground-floor room of less than 30 square metres, shut off from the house, with no heating from the boiler. The question comes up when you change it into something that is no longer exempt, which is what a solid roof does.

What if a roof was fitted without approval?

Councils run a regularisation route for work already done. Cardiff Council lists a regularisation charge of £762.30 against its single-storey extension line, more than the ordinary application, and you may have to open up work so it can be inspected. Far easier to apply first.

Does a glass-to-glass replacement need anything?

Replacing glass with glass, or sheets with sheets, keeps the room a conservatory, so an application is not normally needed. Any new glass must still meet the safety glazing rules.

Price a roof with the paperwork included

When the quote arrives, check who makes the building control application and whether the council charge is written into the price.

We pick out a roof company covering your area and let you know who it is first. Your details only travel once you say so, and there is no charge to you. What happens to your request.

Where you are and how to reach you
Get a quote